Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | BULD - Electrical Clearance | Canceled | NR , CA by contractor | |
| 04/05/2024 | BULD - Electrical Clearance | Not Ready | NR - no neutral lug to attach meter collar | |
| 04/19/2024 | BULD - Electrical Clearance | Canceled | ||
| 05/30/2024 | BULD - Electrical Clearance | Partial Pass | 5/30/24 - System installation looks good. However, a revision to the plan for the as-built, must be submitted and approved before it can be approved and cleared. Recall after revision approval, to get clearance submission. PARTIAL PASS |
|
| 06/04/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |