Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2024 | BULD - Electrical Clearance | Partial Pass | CLEAR INCR for cutover scheduling. PARTIAL PASS is for cutover reconnect clearance. |
|
| 04/01/2024 | BULD - Electrical Clearance | Passed | Solar install complete. CLEAR DGC and BATT |
|
| 04/15/2024 | BULD - Electrical Clearance | Canceled | CA solar inspection by contractor | |
| 06/20/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade, INCR Clearance was called into TEP at 11:45am Pending solar |
|
| 07/05/2024 | BULD - Electrical Clearance | Passed | Approved solar and battery installation - DGC/BAT Clearance to TEP is required |