Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2026 | COT - RSEL - Electrical Final | Re-inspection required | 08/07/2026 Secure dead front panel with screw and ensure breakers are flush to dead front. Plug knockout holes at bottom of main service panel. Secure loose flexible metal conduit and breaker box underneath panel. Metal address tag required at front of panel. Please verify riser is properly supported - wood backing looks soft and degraded from weathering. Unable to locate ground rods. |
|
| 08/17/2026 | COT - RSEL - Electrical Final | Passed | passed CLEARANCE RECN |