Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 11/04/2026 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Re-inspection required |
Provide a 6/12 nailing pattern throughout. Ensure nails are not over penetrated more than an 1/8" . Provide blocking at all seams throughout to provide the 6" nailing. Provide pressure treated 2x at existing masonry wall. Add an anchor bolt at marked area. Provide a35 clips at all outriggers to rafter. 11/4/2026 |
| 11/05/2026 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Passed |
Approved. All corrections were made. 11/5/2026 |