Inspection Status: Partial Pass

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
03/04/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass Customer wanted preconstruction meeting
05/22/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 1-Seal fire-blocking.
2-Install tempered glazing within 24" of swing door.
3-Install dropped ceilings.
4-Roof joists are notched on the bottom.
5-Complete wiring.
Inspection stopped; walk for compliance prior to rescheduling.
07/01/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 7.1.26
1. Finish soffit in bedroom
2. Seal all top plate penetrations
3. Need nail guards on DWV to extend 2" below top and bottom plates.
4. Fascia board damaged
5. Water heater needs drain pan
6. Fire damaged fascia and sheathing on the west side of the building.
7. Large window needs Jack stud and new sill.