Permit: TC-RES-0725-03472

Parcel: 132102760

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
03/06/2026 COT - RSBU - Excavation/Rebar/Zoning  Re-inspection required 3-6-26: schedule an underground plumbing inspection. Uncover/expose all underground plumbing so that we may verify that it was install per approved plans and have system under test. Reschedule at your convenience.
03/10/2026 COT - RSBU - Excavation/Rebar/Zoning  Partial Pass 3/10/26: Reinforcement per approved plans at footing. Please backfill trench and compact then call inspection for Preslab
03/20/2026 COT - RSBU - Excavation/Rebar/Zoning  Partial Pass 3/20/26: Preslab approved ok to proceed with concrete placement.
04/10/2026 COT - RSBU - Excavation/Rebar/Zoning  Partial Pass 4-10-26: reinforcement at cmu walls approved-Okay to grout 1st lift at 4' 6".
04/14/2026 COT - RSBU - Excavation/Rebar/Zoning  Partial Pass 04/14/2026: okay to proceed, verified first lift of CMU wall per foundation detail and plan.
04/22/2026 COT - RSBU - Excavation/Rebar/Zoning  Passed