Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2025 | ENGR Engineering Final | Partial Pass | 8/7/25 Reinforcing correct for Proto retaining wall per plan in table. Footer dimensions are correct. Trench is clean and looks compacted. Build wall per plan. Call us back out when wall complete. We will want to see continuous rock wall pocket before backfilling. Okay to pour footer |
|
| 11/21/2025 | ENGR Engineering Final | Re-inspection required | Coordination of drainage openings between screen wall and retaining wall required. Openings grade every 24’ required per DP17-0223 to provide drainage from the south. |