Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-0725-03465

Parcel: 135090550


Addresses:

1716 S 29TH PL

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
01/08/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 1-Provide approved plans.
2-Provide proof of previous inspection approval.
01/22/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready 1-Provide approved plans.
2-Provide proof of previous inspection approval.

1.22.26
Previous notes remain
Courtesy walk, more items may apply
Seal penetrations through top plate with fire foam
Add bang plates to plumbing where discussed
Fix cinched flex duct on west side
Have DWV under test
03/19/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 3/19/26: exterior sheathing must be properly fastened with approved fasteners (per IRC T602.3), vapor barrier must be removed to verify sheathing, h2.5 clips must be properly fastened throughout, blocking required at soffits, nm cables shall be properly secured every 48", pex shall be properly supported at intervals not to exceed 32" horizontal and 48" vertical, pvc required plastic strapping, mechanical flex shall be secured at intervals not to exceed 5' o.c, nail plates and Boca plates required throughout where rough-ins come closer than 1 1/4" from face of framing member, seal all penetrations throughout at top plate and vapor barrier. STOPPED INSPECTION MORE ITEMS MAY BE ADDED
03/25/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 3/25/26 DVW not on test, insulate pex lines in uninsulated garage, missing nail plates for pex lines in kitchen area
03/27/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 3/19/26: exterior sheathing must be properly fastened with approved fasteners (per IRC T602.3), vapor barrier must be removed to verify sheathing, h2.5 clips must be properly fastened throughout, blocking required at soffits, nm cables shall be properly secured every 48", pex shall be properly supported at intervals not to exceed 32" horizontal and 48" vertical, pvc required plastic strapping, mechanical flex shall be secured at intervals not to exceed 5' o.c, nail plates and Boca plates required throughout where rough-ins come closer than 1 1/4" from face of framing member, seal all penetrations throughout at top plate and vapor barrier. STOPPED INSPECTION MORE ITEMS MAY BE ADDED

3/25/26 DVW not on test, insulate pex lines in uninsulated garage, missing nail plates for pex lines in kitchen area
3/27/26: Pex must be insulated at garage, hot water lines 3/4" and larger shall also be insulated, 12" clearance from can lights required, properly support pex lines throughout, seal off flex duct joints. Per previous notes
03/31/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required issues not addressed
04/03/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 4/3/26
1. shower valve needs to be installed.
2. Flex duct 12” supply when it makes a 90 above kitchen island wall may restrict airflow.
3. Okay to drywall areas with no issues.
04/30/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4/30/26
Pass