Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla switch - DGL clearance was called into TEP at 11:00 am Pending solar final |
|
| 09/12/2025 | BULD - Electrical Clearance | Passed | Approved solar and battery installation - DGC/BAT Clearance to TEP is required for the solar meter |