Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2025 | BULD - Electrical Clearance | Partial Pass | Partial pass. Verbal clearance to TEP INCR/DGL. Gave the verbal clearance for INCR first then same day once TEP restored power gave the DGL for backup switch. There is no clearance code for both DGL/INCR in the drop box section. Refer to notes. Pending solar clearances. 10/22/2025 |
|
| 11/05/2025 | BULD - Electrical Clearance | Passed | 11/5/2025 clearance for TEP DGC/DGL/BAT. |