Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2025 | BULD - Electrical Clearance | Partial Pass | 9/11/25 TEP CLEARANCE: DGL, Tesla switch called TEP @ 10:09. Pending solar |
|
| 09/17/2025 | BULD - Electrical Clearance | Passed | Approved solar with PW3 battery - DGC/BAT Clearance to TEP is required for the solar meter |