Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2025 | COT - RSPL - Plumbing Final | Re-inspection required | 8-18-25: add R3 insulation to hot water copper line and install a shackle on the water heater breaker at main panel. | |
| 09/09/2025 | COT - RSPL - Plumbing Final | Passed | 9.9.2025 Corrections made. |