Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 175A derate, pending tesla switch and solar | |
| 12/04/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter - DGL Clearance was called into TEP Pending solar |
|
| 12/13/2024 | BULD - Electrical Clearance | Passed | Approved solar and Powerwall 3 with 175A derate - DGC/BAT Clearance to TEP is required for the solar meter |