Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2024 | BULD - Electrical Clearance | Partial Pass | Partial pass for future solar use. Called clearance to TEP at 3pm. CLEAR INCR |
|
| 10/23/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance is required to TEP for the solar meter | |
| 12/04/2024 | BULD - Electrical Clearance | Passed | 12/4/24 TEP clearance: DGC called TEP at 10:41 |