Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | COT - RSPL - Rough Soil | Partial Pass | Partial pass to backfill, leave site for connection to main line open for further inspection once connection made, piping holds pressure | |
| 05/08/2025 | COT - RSPL - Rough Soil | Passed | Partial pass to backfill, leave site for connection to main line open for further inspection once connection made, piping holds pressure Connection made, ok to backfill |