Inspection Status: Not Ready
Inspection History: RSBU - Building FinalĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 10/16/2025 |
RSBU - Building FinalĀ |
|
Not Ready |
All receptacles have to be gfci protected. Lighting has to be on a separate circuit from gfci at lav. Provide updated panel schedule. Underground electrical had to be a minimum of 18" deep to the top of pipe and rises either have to be schedule 80 or rigid conduit. 10/16/2025 |