Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 10/08/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
Fire foam all top penetrations that have been missed. Provide clean outs per plan. Move smoke detectors 3' from registers. Missing receptacle in north bedroom and below switch at end of hallway wall. Add grommets to all exhaust fans where the wire enters. Add blocking to register in bathroom. DWV not on test. Wires must extend at least a 1/4" beyond the cable clamp. Replace electrical boxes or provide a proper fix from all plastic tabs being removed from boxes. Per future reference. Provide a 2" clearance at all columns from concrete. 10/8/2025 |
| 10/15/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|