Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
10/07/2024 BULD - Electrical Clearance Not Ready
10/07/2024 BULD - Electrical Clearance Re-inspection required Failed wrong wire sizes, #8 wire was used (150A derate is correct). Please reschedule Inspection
10/09/2024 BULD - Electrical Clearance Not Applicable duplicate
10/09/2024 BULD - Electrical Clearance Passed Approved with 150A derate- DGC clearance to TEP is required for the solar meter