Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2025 | BULD - Electrical Clearance | Passed | Approved meter base and line-side tap box - DGL Clearance was called into TEP at 3:15pm Nothing else inspected at this time |
|
| 03/17/2025 | BULD - Electrical Clearance | Passed | Installed per plans, grounding, bonding and labels per code CLEARANCE DGC 3/17/25 | |
| 12/04/2024 | BULD - Electrical Clearance | Re-inspection required | Failed - installation not per plan, illegal tap inside panel |