Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Interior Shear Bracing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2025 | COT - RSBU - Interior Shear Bracing | Re-inspection required | Nails have penetrated more than an 1/8". Once corrections have been made they need to be taped and mud. Roof truss usually sits on interior wall so that the 5/8" type x is continuous from floor to ceiling. 7/2/2025 | |
| 07/03/2025 | COT - RSBU - Interior Shear Bracing | Re-inspection required | Nails have penetrated more than an 1/8". Once corrections have been made they need to be taped and mud. Roof truss usually sits on interior wall so that the 5/8" type x is continuous from floor to ceiling. 7/2/2025 7/3/25: per previous notes. Not ready |
|
| 07/07/2025 | COT - RSBU - Interior Shear Bracing | Re-inspection required (with fee) | 7-7-25: a/b required at 32" o.c. on exterior walls. Braced panel requires 4 a/b's per panel, add shot pins at marked locations, anchor bolts are required within 12" of a splice on each side, missing nails on exterior sheathing at /edges-joints throughout, loose roof panels-have framer walk entire roof and add nails accordingly. | |
| 07/08/2025 | COT - RSBU - Interior Shear Bracing | Partial Pass | 7-8-25: partial pass-firefoam all penetrations from interior side and reschedule inspection prior to installing drywall. | |
| 09/26/2025 | COT - RSBU - Interior Shear Bracing | Not Applicable | Duplicate inspection | |
| 09/26/2025 | COT - RSBU - Interior Shear Bracing | Not Applicable | Duplicate inspection |