Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2025 | BULD - Electrical Clearance | Canceled | CA by contractor | |
| 01/14/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter | |
| 10/10/2024 | BULD - Electrical Clearance | Canceled | CA by contractor | |
| 11/25/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade, INCR Clearance was called into TEP at 11:35am Pending solar |