Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2024 | BULD - Electrical Clearance | Partial Pass | PARTIAL PASS for Tesla safety switch meter adapter. Gave verbal to TEP tech on site and called clearance to TEP at 8:10. CLEAR RECN |
|
| 10/08/2024 | BULD - Electrical Clearance | Passed | Approved - DGC/BAT Clearance to TEP is required for the solar and Tesla II battery |