Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
09/04/2024 BULD - Electrical Clearance Partial Pass Partial for the 175A derate and Tesla meter adapter - DGL Clearance was called into TEP at 11:00am
Pending solar
09/27/2024 BULD - Electrical Clearance Passed Approved Tesla solar and battery install with 175A derate - DGC/BAT Clearance to TEP is required