Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2026 | COT - RSPL - Rough Soil | Passed | 2-3-26: approved. | |
| 10/02/2024 | COT - RSPL - Rough Soil | Re-inspection required | 10/2/24: gray water missing per plans at bedroom #1 shower, tracer wire required at plumbing outside of building foundation. Plumbing not per plans missing 2" V with wall clean out at hall (note #21) | |
| 10/04/2024 | COT - RSPL - Rough Soil | Partial Pass | 10/2/24: gray water missing per plans at bedroom #1 shower, tracer wire required at plumbing outside of building foundation. Plumbing not per plans missing 2" V with wall clean out at hall (note #21) Not ready, still missing the 2" V with wall clean out at hall. 10/3/2024 10/4/24: revision required for omitting 2" V & Clean out at hallway. Please have revised set of plans prior to final, ok to proceed at risk. |
|
| 10/03/2024 | COT - RSPL - Rough Soil | Re-inspection required | Not ready, still missing the 2" V with wall clean out at hall. 10/3/2024 |