Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 4/23/25: Lath Inspection only ok to brown coat, pending M.E.P inspections. | |
| 05/19/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 4/23/25: Lath Inspection only ok to brown coat, pending M.E.P inspections. 5/19/25 1. All top plate penetrations must be fire caulked. 2. Kitchen island calls for island vent. 3. Water hammer arrestors needed at washer in laundry room, refrigerator water inlet, and dishwasher if applicable. 4. Thermostat must not be any higher than 48" from ground. 5. Mortar needed at shower and bath tub, drains after tub is in place. 6. Secure ground to UFER. 7. Center diffusers in Bedroom 1 and office with windows. 8. HVAC flex duct not per plan throughout, most have been upsized. Provide letter from Mechanical Engineer approving the upsize or replace with correct size per plan. |
|
| 05/20/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 5/20/25 Not ready, homeowner just had questions. |
|
| 05/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and sheet rock throughout. |