Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending solar |
|
| 02/24/2025 | BULD - Electrical Clearance | Passed | 2/24/25 approval for TEP DGC/BAT | |
| 09/18/2024 | BULD - Electrical Clearance | Partial Pass | Partial pass for cutover scheduling and solar CLEAR INCR |
|
| 12/31/2024 | BULD - Electrical Clearance | Re-inspection required | Partial pass for cutover scheduling and solar CLEAR INCR' 12/31/24: Address tag required at new service, riser length exceeds 36" means of support required. |