Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter - DGL Clearance was called into TEP at 10:05am Pending solar |
|
| 09/10/2024 | BULD - Electrical Clearance | Passed | Approved solar and battery installation - DGC/BAT Clearance to TEP is required |