Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Preslab and floodplain
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2023 | COT - RSBU - Preslab and floodplain | Re-inspection required | 11/29/23: canceled per contractor 11/30/23: rebar not to plan. Plumbing needs to be wrapped |
|
| 12/04/2023 | COT - RSBU - Preslab and floodplain | Passed |