Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 11/04/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
DWV not on test. Secure vertical pex lines throughout. Add nail plates to those that are less than an 1 1/4" from face of stud. Exhaust fan not wired in laundry room and missing seals. Missing receptacle for hallway. Add receptacle in master bedroom per wall greater than 2'. Seal off exterior and top penetrations. Provide 18" of copper at water heater and main water line. Missing switches per plan. Stopped inspections other items may occur. 11/4/2024 |
| 11/04/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
DWV not on test. Secure vertical pex lines throughout. Add nail plates to those that are less than an 1 1/4" from face of stud. Exhaust fan not wired in laundry room and missing seals. Missing receptacle for hallway. Add receptacle in master bedroom per wall greater than 2'. Seal off exterior and top penetrations. Provide 18" of copper at water heater and main water line. Missing switches per plan. Stopped inspections other items may occur. 11/4/2024 |
| 11/07/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|
| 11/07/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|
| 11/07/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|
| 11/07/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|