Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-RES-0723-06722
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Please fire foam all penetrations through top plate in existing house, one cable, not secured properly in a Jay box in the ceiling. In the addition, please terminate properly.,DWV not under test, Tub spout not secure properly please block all stove outs for sink and toilet are loose place secure properly, three-quarter pecks lines not clamped in plumbing wall, electrical wire in kitchen area where plaster was cut away need to be in metal conduit, no nail stops on wiring for stove at top plate, please remove switches and outlets to verify metal box grounding in all areas | |
08/13/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | Please fire foam all penetrations through top plate in existing house, one cable, not secured properly in a Jay box in the ceiling. In the addition, please terminate properly.,DWV not under test, Tub spout not secure properly please block all stove outs for sink and toilet are loose place secure properly, three-quarter pecks lines not clamped in plumbing wall, electrical wire in kitchen area where plaster was cut away need to be in metal conduit, no nail stops on wiring for stove at top plate, please remove switches and outlets to verify metal box grounding in all areas | |
08/28/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | No test on hot side of plumbing | |
08/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |