Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/09/2023 | BULD - Electrical Clearance | Partial Pass | Partial for the service panel upgrade, INCR Clearance to TEP is required for the cutover Pending solar |
|
| 11/28/2023 | BULD - Electrical Clearance | Canceled | 11/28/23 canceled per contractor | |
| 12/04/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |