Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2023 | BULD - Electrical Clearance | Canceled | NR, cancelled TEP power-kill, inspection cancelled by Contractor | |
| 09/14/2023 | BULD - Electrical Clearance | Not Ready | NR, 2nd TEP power-kill cancellation, inspection cancelled by Contractor | |
| 10/13/2023 | BULD - Electrical Clearance | Partial Pass | Partial for the service panel upgrade, INCR Clearance was called into TEP at 2:20pm pending solar |
|
| 10/24/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |