Inspection History Details
Inspection Status: Re-inspection required
Inspection History: Pool/Spa - Pre-Gunite
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2023 | Pool/Spa - Pre-Gunite | Re-inspection required | 11/17/23: plumbing incorrect at spa looped above bond beam, plumbing at north east corner sticking out of bond beam needs to be moved further north detail needed for three unsupported walls of spa where plumbing is running through |
|
| 11/29/2023 | Pool/Spa - Pre-Gunite | Re-inspection required | per previous notes. details on spa are not per plan. provide tech on site for next inspection. 11/29/2023 | |
| 12/07/2023 | Pool/Spa - Pre-Gunite | Passed |