Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 10/05/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
10/5/23: plans need to be revised, scope of work does not mention full bathroom remodel, removal of interior walls in existing house, framing, electrical or mechanical changes. Interior of existing house has been modified. |
| 12/12/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
12/12/23: approved plans not on site |
| 12/13/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
12/13/23: revised plans not on site |
| 12/22/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
12-22-23: Approved plans are onsite showing full bathroom remodel, interior wall removal, electrical and mechanical changes. All demolition and rebuild is per plans onsite. Okay to proceed with installation of insulation, drywall installation, taping, and texture. |