Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2026 | BULD - Electrical Clearance | Partial Pass | partial pass for Tesla switch and breaker swap CLEARANCE DGL | |
| 08/17/2026 | BULD - Electrical Clearance | Passed | 08/17/2026 Clearance TEP BAT. Added Tesla PW3 batteries and expansion pack to existing PV system. |