Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - BULD - SWG Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 06/30/2026 |
COT - BULD - SWG Clearance |
|
Re-inspection required |
10. Mil tape unions on each side of connections. Tracer wire needs to be direct burial, tracer wire with continuation all the way through. support for 1 inch riser black iron at home. Csst needs to be installed on rooftop at AC connection. |
| 07/02/2026 |
COT - BULD - SWG Clearance |
|
Passed |
7-1-2026 SWG APPROVED BY GA |