Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 09/03/2026 |
COT - RSBU - Preslab |
|
Re-inspection required |
Plans call for 2 #4 rebar In bottom of footing, missing vapor retarder |
| 09/08/2026 |
COT - RSBU - Preslab |
|
Re-inspection required |
9-8-26: install a specialized polyethylene seam tape or double-sided butyl seal tape on vapor barrier. Tape must be applied on the entirety of all seams with with a minimum 6" overlap. Make sure to provide UL listing on tape is used and reschedule an inspection. |
| 09/09/2026 |
COT - RSBU - Preslab |
|
Passed |
9-9-26: corrections made. Okay for concrete placement. |