Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/15/2026 | COT - RSME - Mechanical Final | Re-inspection required | 06/15/2026 Temp and pressure relief valve is blocked from fully opening and copper pipe must be reconfigured to drain gravity down - currently it is traveling upwards. Seal gas flue and insulate hot water line. |
|
| 06/16/2026 | COT - RSME - Mechanical Final | Passed | 06/16/2026 Verified all corrections made to prior inspection. |