Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Grounding/BondingĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2026 | COT - RSEL - Grounding/BondingĀ | Re-inspection required | 10/22/2026 6mil vapor barrier required. Clean trench at footer to fully encase rebar. Plan calls for 10x10 welded wire mesh in slab and holdown STHD14 or HTT5 at shearwall B. |