Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Stem Wall/Retaining Wall
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2025 | COT - RSBU - Stem Wall/Retaining Wall | Partial Pass | Partial pass, ok to pour and proceed | |
| 07/28/2025 | COT - RSBU - Stem Wall/Retaining Wall | Partial Pass | 7.28.25 Partial pass, pour and proceed |
|
| 08/04/2025 | COT - RSBU - Stem Wall/Retaining Wall | Partial Pass | 8.4.25 partial pass Okay to pour last lift and finish wall at between lots. Okay to pour 4' lift for Perimeter retaining wall. Reinforcing correct. Bond beam correct. Vibrate all Grout. Call in pregrout inspection for last lift of South perimeter wall. |
|
| 08/06/2025 | COT - RSBU - Stem Wall/Retaining Wall | Partial Pass | Okay to pour final lift on screen wall portion of South perimeter. |