Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/12/2025 |
ENGR Engineering Final
|
|
Passed |
Retaining walls are complete at perimeter and between lots. Steel view fence is now being built at Rear of lot 224. CMU block fence is being built between the two lots at top of wall, starting at the rear and extending about 70’ as shown in plot plan of lot 224. |