Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2026 | RSBU - Building Final | Re-inspection required | 09/22/2026 Add breaker lock to electrical water heater circuit at panel. Contractor is waiting for gas utility to connect. Conditions need to be satisfied prior to building prior. |