Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2025 | COT - RSEL - Electrical FinalĀ | Re-inspection required | INCR Clearance was called into TEP to reenergize NOTE: Work is being performed without permit, proper permits shall be obtained prior to final |