Inspection Status: Passed

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
01/05/2026 BULD - Electrical Clearance Passed 1.5.26
Approved for DGC clearance to TEP
01/05/2026 BULD - Electrical Clearance Passed 1.5.26
Approved for DGC clearance
12/03/2025 BULD - Electrical Clearance Partial Pass 12.03.2025
Verbal clearance to TEP INCR for 200A MPU at 12:50pm. Partial pending solar final.
12/17/2025 BULD - Electrical Clearance Not Ready
12/17/2025 BULD - Electrical Clearance Not Ready
12/24/2025 BULD - Electrical Clearance Canceled Canceled per contractor. 12/24/2025
12/24/2025 BULD - Electrical Clearance Canceled Canceled per contractor. 12/24/2025