Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2025 | COT - RSBU - Preslab | Re-inspection required | 1. Porch post foundation not per plan. 3 in patio and 1 on the southeast end. 4 total. 2. Horizontal bent bars needs to be 3" minimum from earth. 3. Rebar in north bathroom corner is touching earth needs minimum 3" separation. |
|
| 10/03/2025 | COT - RSBU - Preslab | Passed | All corrections have been made. Okay for concrete placement. 10/3/2025 |