Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | No answer at 12:50 PM. After texting at 12:41. | |
| 02/27/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Note: Gas line under slab will be re-routed before final. | |
| 12/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 12.15.25 Missing receptacle at bedroom area, receptacle required within 6 feet of door and within every 12 ft after. Missing receptacle at bathroom vanity. Add nail plates throughout to protect pex and romex Add 2 inch Boca/bang plates to protect plumbing as discussed Interior DWV must be under test |
|
| 12/23/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 1-Need stud shoes at laundry wall. 2-Romex entering metal box needs protction. 3-Finish vent piping and provide test for DWV piping. 4-Window is missing in new laundry room. 5-Need operable window in new bathroom. 6-Sill plates in new laundry are not per Code. 7-Beam is notched. 8-Termite damage needs to be mitigated. |