Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2026 | BULD - Electrical Clearance | Partial Pass | Partial pass for TESLA BACKUP, CLEARANCE DGL | |
| 09/09/2025 | BULD - Electrical Clearance | Canceled | 9.92025 Canceled by contractor. |
|
| 09/15/2025 | BULD - Electrical Clearance | Re-inspection required | Called 206) 476-0077, left voicemail.No response. | |
| 09/16/2025 | BULD - Electrical Clearance | Partial Pass | TEP Clearance: INCR, called TEP @ 2:00. Partial pass. | |
| 10/16/2025 | BULD - Electrical Clearance | Re-inspection required | 10.16.2025 On-site does not match uploaded plans: missing 60A fuses at disconnect, missing Tesla Powerwall expansion harness, 5 strings going to roof. |