| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2025 | COT - RSEL - Grounding/Bonding | Not Ready | Ufer is not installed. | |
| 04/25/2025 | COT - RSEL - Grounding/Bonding | Partial Pass | Partial pass for ufer, will check connection at intermediate stage | |
| 10/14/2025 | COT - RSEL - Grounding/Bonding | Not Ready | ||
| 11/13/2025 | COT - RSEL - Grounding/Bonding | Re-inspection required | 1-Cover all wiring below 8’. 2-ensure that permanent access is provided for Ufer connection to Grounding Electrode Conductor. 3-Light at North side is not shown on plans. |
|
| 12/05/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed final 12/5/25 |