Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 12/9/25: Electrical panel must be accessible for intermediate inspection, seal all penetrations going through top plate and exterior vapor barrier throughout, DWV must be burped and topped of, b-vent at south mechanical room must maintain proper clear from combustibles, electrical clearance will be released when access to panel is obtained. Verify R-8 flex in attics, verify exhaust fan at mud room, over notched studs in garage at refrigerant lines. | |
| 12/11/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 12/11/2025 per previous notes. | |
| 12/12/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required (with fee) | 12/12/25 1. DWV not under test per previous notes. 2. Exhaust fan is still missing in mud room.This is the 3rd inspection the next one requires a fee. |
|
| 12/16/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12.16.25 approved corrections have been made |