Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
12/09/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12/9/25: Electrical panel must be accessible for intermediate inspection, seal all penetrations going through top plate and exterior vapor barrier throughout, DWV must be burped and topped of, b-vent at south mechanical room must maintain proper clear from combustibles, electrical clearance will be released when access to panel is obtained. Verify R-8 flex in attics, verify exhaust fan at mud room, over notched studs in garage at refrigerant lines.
12/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready 12/11/2025 per previous notes.
12/12/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 12/12/25
1. DWV not under test per previous notes.
2. Exhaust fan is still missing in mud room.This is the 3rd inspection the next one requires a fee.
12/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12.16.25
approved corrections have been made