Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter collar - DGL Clearance was called into TEP at 9:05am Pending solar |
|
| 09/25/2024 | BULD - Electrical Clearance | Passed | Approved with 175A derate - DGC/BAT Clearance to TEP is required for the solar and battery |